All Creatures Great & Small

Downers Grove, Illinois

Contractor: RWE Management

Architect: Linden Group

New Masonry

  • Furnish, set-up, maintain, dismantle and remove all equipment (lifts, tube scaffolding, ladders, hand tools, etc.) necessary for the new masonry portion of the project.
  • Furnish and install natural stone veneer at the exterior of the building and to cover one (1) interior fireplace face as per drawings (as per below selection). Stone is to be installed in random ashlar pattern as per drawings using natural gray type ‘N’ mortar.  Mortar joints are to be tooled concave, brushed and tooled to a final finish.
  • Furnish and install stone sills, one (1) interior fireplace hearth, one (1) interior fireplace mantel, and one (1) stone chimney cap as per drawings.
  • Furnish and install one (1) two-piece adjustable anchor attached to substrate every 16” O.C. horizontally and vertically.
  • Furnish and install 40mil self-adhesive flashing at the base of new masonry veneer and over openings in masonry veneer with cotton rope “weeps” installed in masonry head joints every 24” O.C.